Hydroseeding technology cost analysis

2015-11-04 10:25:59

Hydroseeding technology is more and more popular in slope greening projects now. Our factory is a professional manufacture of hydro seeder equipment in China and has rich experience on the slope greening projects. Here we show you the cost in hydro seeding projects in China.

The costs consist mainly of the worker salary, raw material costs, the depreciation of hydroseeding equipment, the fuel, etc.
1.Labor organization

There is high requirement on the skill of operators of the hydro seeder machines and drivers according to the equipment and the technology. The job of high-demand operating capacity implements the fixation of posts and staff and should try to maintain the stability of technicians. Other jobs can operate by the temporary workers or by technicians depending on the actual situation.

The specific labor arrangements are as follows:

Type of jobs

Quantity

Remarks

The operator of hydro mulcher machine

1

Mixing and spraying the mixture

Driver of truck

1

Driving

Loader, Soil screening machine

2

Loader driver(truck driver can be instead);the management of soil screening machine

Other auxiliary workers

5~8

Hanging net, crushing soil(allocating depending on the actual situations in site)

Manager

2

 


Hydroseeding technology


2.The main equipment(here we use our PB8083 Hydroseeding equipment and ZST02 Soil screening machine as the example)
 

Device

Specification

Qty.

Power

Remarks

Hydro seeder

PB8083

1

83KW

Spraying the mixture

Soil screening machine

ZST02

1

11KW

Screening soil

Wheel loader

1.2t

1

26KW

Feeding for sand screening machine and hydro seeder.

Truck

NXG1246D3PL1

1

176KW

Carrying the hydro seeder to the construction site

 hydro seeder machines

3.The auxiliary materials

3.1 steel mesh

steel mesh material is galvanized wire mesh.

mesh size is 5*5 cm, and the diameter of steel mesh is 2.0 mm.

3.2 non-woven fabrics

Selecting high-quality non-woven fabrics with the specification of 15g/ m2     

slope green machine

4.Cost analysis

4.1 Working system

Work for nine hours every day, single-team operation, ten people per team.

If the thickness is 8 cm, PB8083 hydro seeder which is 6 m3 per tank, can spray 75 m2. (6/0.08=75 m2)

Including the time of preparation, mixing the material and hanging nets, the operator can spray at least 8 tanks every day, namely 600 m2.

The depreciation of hydro seeding equipment, residual value is charged as 5%.

No.

Item

Unit price

(RMB)

Qty.

Total

(RMB)

Remarks

1

Labor

operator

150/day

1

150

 

Driver

150/day

1

150

 

worker

120/day

8

960

 

Manager

200/day

2

400

 

 

 

 

 

 

2

Material

Soil

50/ m3

40m3

2000

 

Grass fiber

18 /bag

96bag

1728

15 Kg/bag

Fertilizer

 

Adding according to the actual situation of the soil (about 600 yuan)

Turf soil

7/bag

240bag

1680

10Kg/bag

Husk

1/kg

3200kg

3200

 

Saw dust

1/kg

3200kg

3200

 

Grass seed

 

12kg

600

 

Steel mesh

6/m2

630m2

3780

 

Non-woven fabrics

0.5/m2

600m2

300

 

Water

10/m3

26m3

260

 

 

 3  

Fuel

 8 

170L 

1360

 

Post-stage maintenance

 

 

4200

Watering, pest control, etc.

 5  

Depreciation of equipment

 

 

120

 

 

 

 

Total

24688

 

The Hydroseeding technology cost per square: the total price / 600 = 24628 / 600 = 41.15 / m2

(the bolt expenses, the loan interest and risks costs are not calculated in the above costs.)

Hydroseeding technology cost

It is just for reference that material ratio, the supporting equipment and cost analysis. The specific cost of hydroseeding working should be calculate according to the local situation of construction unit, the material condition of the site of the project, the water, the clay court, the slope soil and the requirements of the project.


hydroseeding cost

 

Inquiry >>
Products you need :
Your name :
Your tel :
* Your mail :
Your company :
Your country :
* Inquiry :
 
COPYRIGHT © GAODE EQUIPMENT CO.,LTD. Site Index Product IndexPrivacy Policy Technical Support:coverweb