Trailer concrete pump is equipped with a double cooling system: air-cooled and water-cooled. Make sure the equipment works even in extreme heat (temperature above 40 °C). Unique reversing buffer design: The reversing impact of the concrete pump not only causes damage to the hydraulic system, but also shortens the service life of hydraulic components and mechanical components.
More importantly, during the construction process, due to the large impact vibration, the cloth hose is difficult to control and will bring up the cloth. Good floor heating pipes bring great inconvenience to the builders. In response to this shortcoming, the new racing machine adopts the original reversing buffer technology, which successfully eliminates the pressure shock of the commutation moment, and the commutation is extremely stable.
Precautions for concrete pump application piping:
The piping configuration of the fine stone concrete pump should be piping according to the characteristics of the construction site and the concrete pouring scheme. When designing the piping, it is necessary to check whether the horizontal conversion distance of the tube is compatible with the pumping distance of the concrete pump. When piping the fine concrete pump, the length of the pipeline should be shortened as much as possible, and the elbows and hoses should be used less.
Also the laying of the pump pipe of fine stone concrete should facilitate the cleaning, troubleshooting and disassembly and maintenance of the pipeline. When the new pipe is used in combination with the old pipe, the new pipe should be placed at a higher pumping pressure. A piping diagram of trailer concrete pump used in Malaysia should be drawn during the piping process of the fine stone concrete pump, and the specifications and quantities of various fittings, pipe clamps, elbows and hoses are listed and provided. If vertical pipe is required, as the height increases, the potential energy increases, and the concrete tends to flow back. Therefore, a horizontal pipe of a certain length should be laid between the concrete pump and the vertical pipe to have sufficient resistance to concrete backflow.