2016-09-18 15:29:48

1. If the concrete pump is powered by an electric motor or diesel engine, observe the "Motor security rules" or "diesel engine safety rules" on the use of part.

2. The pipeline should be firmly supported, the connectors should be firmly coupling can’t be pressurized or hanging weights on the pipe.

3. Check the electrical equipment is intact, various instruments are normal, transmission security devices and the hopper filter and safety devices are complete and reliable. Various parts of the operation switches, buttons, handles, etc. should be in the correct position.

4. Check the coupling parts is loose, the tightness of the drive chain should be maintained within a predetermined range.

5. Open the release valve, open the motor idling for 2-3 minutes, check whether the components in the normal direction of rotation is correct.

6. The pumping process, pay attention to the pressure gauge indicates more than the prescribed pressure should immediately identify the reasons for troubleshooting.

7. Should check squeeze tube wear and tear, such as found in plasma leakage should stop to check the repair or replacement, in order to continue operations, it found clogging, timely check processing.

8. Downtime due to failure, open the vent valve so that the pressure drop pulp and troubleshooting. No concrete pump pressure drops to zero, do not remove the air chamber, pressure relief valve and piping, but extends into the body can’t handle the operation.

9. In the operation of the machine, it is prohibited to make any adjustment and maintenance work can’t climb or ride on the pipeline.

10. After the production, should stop feeding the slurry pump concrete and all sent, according to the following shutdown sequence:

     1) Stop pumping

     2) Turn off the power source.

11. When the pump stops, immediately remove the hopper and concrete pipes, cleaning (washing water or gas) pump, hopper valve boxes, pipes and so on. While cleaning, personnel should leave the discharge gas nozzle and elbow joints, to avoid accidents.

12. The manual cleaning rotating pump parts, should pay attention to stand in a safe location, beware of slipping into a stirred tank (bucket) in the. When cleaning pump housing, be careful not to make the water into the electrical box, solenoid valves and other parts. After cleaning the electrical box outside the hood clean water.

13. After cleaning the various circuit switch knife off before leaving. 

Inquiry >>
Products you need :
Your name :
Your tel :
* Your mail :
Your company :
Your country :
* Inquiry :
 
COPYRIGHT © GAODE EQUIPMENT CO.,LTD. Site Index Product IndexPrivacy Policy Technical Support:coverweb