A:Foam concrete machine used Raw Materials for making CLC Bricks / Blocks would be Cement, Fly-Ash / Sand, Foam, Water & Lime (If-Needed).
A:The minimum output of equipment of our company is 5 cubic m³per hour and the maximum 25 cubic m³per hour. The construction can be made at a staggering rate.
A:The service life of foam concrete is about the same long as that of the main buildings.
A:Roofing Insulation.Foamed concrete has two benefits when it is used for roofing. First, it provides a high degree of thermal insulation.
A:The Housing project and the many filling projects can be used.
A:In-Direct Advantages of CLC foam concrete blocks are in the form of Thermal Insulation, Sound Reduction, Less Water Absorption, etc...
A:Foamed concrete is a versatile material.
A:The warranty will be one year from the date of shipment. Any detected parts during this period caused by the quality of products will be replaced by seller free of cost (exclude vulnerable parts and the breakdown caused by improper operation and other man-made reasons). Of course, if you need spare parts over the warranty period, please keep free to contact with us and we are always here offer service in 24hours every day.
A:We have our own experienced QC. There will be strict inspection and testing for every order before shipping out.
A:If necessary, we would dispatch engineers to you for technical collaboration.
A:If use blade cutting machine: Longer cutting time after pouring concrete; Need 2 machines for cutting in 2 directions; High blade consumption, especially if the sand in CLC is course or density is High. But if use our GW30B wire cutting machine, it will solves the above problems.
A:Yes, the hydraulic foam concrete pump is equipped with PLC control panel and remote controller.
A:We have GP30 foam concrete pump and GH series hose pump for option. Tell us your detailed demands and we would recommend the reasonable model and best quotation once get your information.
A:Yes, the foam concrete mixing machine mainly integrated foam generator system, mixing system, feeding hopper, water pump and control panel.
A:Yes, you can. Ceramisites could be also as the raw materials, and it could enhance the compressive strength of the wall.
A:Cement dosage no less than 30% at least, Sand/Fly-ash/Stone powder dosage no more than 70% at least, Foaming agent dosage 0.5~1.2liter normally.
A:For making CLC bricks/blocks, the materials are mainly cement, fly-ash/sand/stone powder(as option), foam agent, water and Polypropylene fiber, etc.
A:The main difference is that CLC products belongs to Physical response, AAC products belongs to Chemical response.
A:Foam concrete machine can be used for making blocks/bricks, wall cast in-situ, roof insulation, void filling, trench reinstatement, bridge abutment work, and many others.
A:1. Our machine can make the foaming , mixer , pump together. 2. Our machine can automatically adjust the density. 3. Our foam concrete machine can easy to control and operate .
A:We off 12 months quality warranty for the mud pump for drilling rig main body.
A:The flow The pressure The power: electric, diesel, hydraulic motor or without. If electric, kindly also let us know the voltage and frequency in your working site.
A:Yes, we are the Mud Pump manufacturer in China. Our high quality and extensive range of products are highly preferred in the market owing to their superior performance in a reliable and enduring manner.
A:A mud pump is a reciprocating piston/plunger device designed to circulate drilling fluid under high pressure down the drill string and back up the annulus. Mud pump is a large reciprocating pump used to circulate the mud (drilling fluid) on a drilling rig. It is an important part of the oil well drilling equipment.
A:Most commonly, operator error is the cause of problems with concrete pumps. Pump line blockages can also occur and these are due to either operator error, a problem in the concrete mix design or insufficient mixing of all the ingredients used to make concrete, which can cause segregation of the mix. A delay in placing concrete due to traffic congestion or problems on site can also result in concrete pump blockages as can hot weather resulting in concrete setting too quickly and causing an increase in pressure in the pump. But, if managed properly and maintained well by a trained and experi